|
Longerenong Sowing Plan and Crop Management As At July 29th 2004 |
|||||
|
Paddock/ Hectares |
Crop & Variety |
Sowing Date /Rate (kg/ha) |
Fertilizer & Rate (Kg/ha) |
Spray Program (so far) / Hectare |
Comments |
|
9. 43 ha |
Yitpi wheat |
9th June 85 |
Mallee mix 8 @ 85 |
400 ml/ha LVE MCPA (herbicide) plus 5 gm/ha Ally (herbicide) plus 80ml/ha Lontrel (herbicide) plus 0.1% wetter plus 100 ml/ha Dimethoate (insecticide) on 29th July by contract. |
Prickle chained 10 ha around outside at sowing. |
|
17. 35 ha |
Digger lentils |
16th June 50 |
Mallee mix 8 @ 65 kg/ha at sowing. |
0.7 L/ha Triflur (herbicide) and prickle chained to incorporate Triflur on 17th June. 660 gm/ha Gesatop (herbicide) on 22nd June by contract. Border sprayed with Dimethoate @ 85ml/ha on 12th July |
|
|
20 52 ha |
Beacon canola |
20th May 4.5 |
Urea – 100 pre-drilled 10th May Mallee mix 8 @ 80 at sowing |
1.5 L/ha Triflur (herbicide) plus 0.8 L/ha Chlorpyriphos (insecticide) on 21st May (prickle chained to incorporate it). 300 ml/ha Correct (herbicide) plus 400 ml/ha Endosulphan (insecticide) plus 0.1%Chemvet (adjuvant) plus 0.5% Hasten (adjuvant) on 21st June by contract. 100ml Verdict (herbicide) plus 0.5% Hasten (adjuvant) on July 13th. 1.1 Kg/ha Gesaprim 900 (Simazine herbicide) plus 120 ml Lontrel plus 1% Uptake oil on July 19th by contract |
Stubble mulched – 17th February Gypsum applied @ 1 tonne/hectare in April (sulphur rather than soil conditioner) Burnt stubble – 7th May |